Project:   Rans - S-21 Outbound   -   VIEW REPORTS
Total Hours:1711.75
Total Flight Time:6
Total Expense:N/A
Start/Last Date:Oct 19, 2020 - No Finish Date
Engine:Rotax 915is
Propeller:Whirlwind
Panel:Dynon
 
Friendly URL: https://eaabuilderslog.org?s=phowe

Home or Last Project Picture

Apr 10, 2024     Light on the Rear of theA Vertical Stabiliser - (4 hours)       Category: Lighting
We drilled a hole through the top of the rear fuselage skin where it will be under the vertical stabilizer. We installed a grommet and passed the wire through. We then created wire mounting points from the bottom of the fuselage to the access hole and zip-tied the wire out of the way so there was no possibility of the wire becoming tangled in the control cables in the rear. Taylor then built a recessed connector bracket for the wire coming from the light down the stabilizer. This will connect with the wire up from the fuselage. We will also install a connector to the light for easy removal.


 